Checkbox Security Won't Carry a Reactor

The cyber capabilities the IMO's 2030 Nuclear Code and the IAEA's ATLAS will demand of shipowners and shipyards

Julius Shin
Julius Shin
Maritime Technical Consultant · Shipboard Cybersecurity & Compliance
- LinkedIn : https://www.linkedin.com/in/abysstoinfinity

Merchant ships carrying small modular reactors (SMRs) are no longer science fiction. Among shipping's options on the road to net zero, SMRs are one of the few cards that can take alternative-fuel price risk and carbon-regulation risk off the table in one move.

Nuclear Code revision: target 2030ATLAS: security is its own pillarNuclear cyber sits on top of E26The boundary has no rule yetE26 is the training groundCapability, not a stamp

But whether anyone can actually play that card will be decided by how we treat cybersecurity today, even before reactor technology settles the question. IACS UR E26/E27 should be treated as a starting point, not as "a procedure that ends once the class stamp is in hand." Shipowners who start now to build and steadily strengthen cyber resilience and security control capabilities at the ship and fleet level will reach the level of cyber resilience needed to operate a reactor safely, and will have the business capability to play the SMR card whenever they choose. For shipyards, what is at stake is the capability to win orders for high-value nuclear ships.

The rules are already being written

The international rules for nuclear merchant ships are being rewritten with 2030 as the target. It is the first full revision since 1981.

▸IMO: The revision of the Nuclear Code (A.491(XII)) and SOLAS Chapter VIII began when MSC 110 (June 2025) approved a proposal co-sponsored by the Republic of Korea, the United States, IACS, ICS, RINA, ITF and WNTI. SDC 12 (January 2026) drew up the roadmap, and the target is adoption at MSC 118. The core of the revision is to make rules once tied to pressurized water reactors (PWRs) technology-neutral and to align them with IAEA standards.
▸IAEA: ATLAS (Atomic Technologies Licensed for Applications at Sea) was launched in Washington in August 2026, with the IMO taking part. Six project groups divide the work: international safety codes and standards, the legal and regulatory framework, maritime classification, safeguards, nuclear security, and a deployment roadmap covering technology, infrastructure and the fuel cycle.
▸Market: LR and ABS have already granted Approval in Principle (AIP) to several Korean nuclear-powered ship concepts.

What stands out is that security is a separate pillar from the start. The IAEA's nuclear security framework includes computer security for nuclear facilities. The moment the Nuclear Code is aligned with IAEA standards, cyber requirements for reactor instrumentation and control (I&C) come aboard with it.

Nuclear cyber is built on top of E26

Cybersecurity for nuclear-powered ships does not start from scratch. It adds one more layer on top of the E26/E27 requirements that already apply to conventional ships.

▸Lower layer (ship OT/IT): Navigation, propulsion and communication systems on a nuclear ship still follow E26/E27. Asset identification, zone and conduit design, and supplier security evidence are needed just as before.
▸Upper layer (reactor I&C): Nuclear-grade requirements are likely to be added here. If IAEA standards apply, computer security requirements based on a design basis threat (DBT), defence in depth and safety classification will follow, along with review by each country's nuclear regulator.
▸Boundary (where the two regimes meet): No rule yet says how data flows between reactor control and ship systems should be separated and controlled. This is where the biggest gap lies.
Layers of cybersecurity on a nuclear-powered ship
Upper layer · Reactor I&C
Nuclear-grade computer security
Design basis threat, defence in depth, safety classification · review by the nuclear regulator
Boundary · no rule yet
Data flows between reactor control and ship systems — the biggest gap
Lower layer · Ship OT/IT
IACS UR E26 / E27
Asset identification, zones and conduits, supplier security evidence
Foundation · Organizational capability
A working cyber management system, the people who run it, asset and drawing data under change control, a verified supply chain

Shipboard small reactors are designed with passive safety as the top priority. Because their safety functions depend less on digital control, a cyberattack may have less room to threaten reactor safety directly than at a land-based plant. But the cybersecurity challenge does not disappear. The controls that match reactor output to the ship's power demand, the monitoring systems, the physical protection of nuclear material, and propulsion availability that keeps the ship moving all still need protecting. Even without a safety incident, the moment a cyberattack leaves a nuclear ship stranded mid-ocean, every ship of the same design loses trust.

What matters in this structure is that the upper layer assumes the lower one. You cannot put nuclear-grade security on a ship whose asset list is wrong, whose drawings do not match the real network, and whose supplier evidence exists only on paper.

And this capability does not appear overnight. A working cyber management system, the people who run it, asset and drawing data under change control, and a verified supply chain are built up project by project, ship by ship. E26 is the training ground for that capability.

The bill for checkbox security

The "just get the certificate" approach is cheap and fast for now. But the cost does not disappear; it is carried forward. The bill arrives in the SMR era.

Shipowners:
It means erasing one strategic option on the road to net zero with their own hands. To operate a nuclear ship, they will likely be asked to prove their cyber management capability to class, the flag state, nuclear regulators and ports of call. A fleet that completed E26 only on paper will have no record to show. It will lose a card that could hedge against alternative-fuel prices and the uncertainty of carbon regulation.
Shipyards:
It means giving up the capability to build high-value SMR merchant ships. Competition for nuclear ship orders will not be decided by hull and dock alone. The ability to integrate the reactor and ship systems into one security architecture, and to prove it, will become a condition of winning orders. With Korean concepts already holding AIPs, the race has begun.

A cheaply obtained stamp saves money today, but it hands back tomorrow's ticket in advance.

And there is a bigger bill: entering the market without the capability, and then having an accident. Past maritime and nuclear accidents show how large that bill can be. There is no real-world accident involving a nuclear merchant ship yet, and shipboard SMRs are far smaller than land-based plants, so the numbers cannot simply be plugged in. Still, placing two accidents side by side shows which dimension stretches out.

BP Deepwater Horizon (2010) Fukushima Daiichi (2011)
Direct response Well capped after 87 days Decommissioning: official target 30–40 years
Cost More than USD 65 billion Government estimate about JPY 23.4 trillion (2023); independent estimate JPY 35–80 trillion (JCER, 2019)
Return to normal business New Gulf of Mexico platform started 13 years later Still ongoing 15 years on
Trade and diplomatic fallout Almost none Seafood import restrictions still in place in 2026

Two reasons overlap in Fukushima's long recovery. Radioactive material such as cesium-137, with a half-life of about 30 years, and melted fuel debris mean that physical recovery alone takes decades. On top of that comes a problem of trust: even after the discharged water and seafood were judged scientifically safe, import restrictions continue to be used as a diplomatic card.

An accident on a nuclear merchant ship might cost something closer to BP, but its recovery time is likely to resemble Fukushima. Shipboard SMRs are small and designed for passive safety, so physical contamination would be far smaller, but lost trust does not come back any faster. Even without a radiological release, a single accident could spread into port refusals and entry restrictions, the suspension of every ship built to the same design, and delays to nuclear propulsion across the whole industry. On top of that, the 1962 Brussels Convention on the liability of nuclear ship operators has never entered into force. There is effectively no international framework for who is liable, and up to how much, if an accident happens.

The cost of making sure a cyber incident is never the starting point is small next to that bill.

What to do now

There is no reason to wait until 2030. Those who build the capability before the rules are final also get a seat at the table where the rules are made.

Shipowners

1Do not let E26 implementation end at delivery; carry it into an operational cyber security management system (CSMS).
2Keep asset lists and network drawings for the whole fleet in line with the real state of each ship. Even when nuclear-grade reviews arrive, this will be the most basic evidence.
3Build cyber incident response and recovery procedures so that the ship keeps moving after an incident, and train crew and shore teams together. Training records, not documents, will be the evidence of a capability to operate nuclear ships.

Shipyards

1From the contract design stage, be the first to propose that cybersecurity requirements be written into the specification, and make a strong case for it to the shipowner. If the specification is silent, bids end up competing on lowest price, and the work ends with matching the stamp just before delivery.
2Agree on a level of requirements that carries through into operation, not the bare minimum for E26/E27. Include the handover of asset and drawing data and supplier security evidence. Only when the cost and schedule are reflected in the contract can the shipyard deliver properly.
3With shipowners considering nuclear ships, propose defining the security requirements at the boundary between the reactor and ship systems together, from early design. The IMO Nuclear Code revision and the IAEA ATLAS work provide the grounds.

Closing

A ship that can carry a reactor is completed when today's security work is added on top of world-class shipbuilding capability. The gap between organizations that see E26 as a cost and those that see it as a capability will show up as a gap in who holds a ticket to the nuclear merchant ship market of the 2030s.

I did not write this to frighten anyone. As electrical and electronic systems take up a growing share of every ship, ship cyber resilience is becoming a defining task of our time. Yet low-price bidding that leaves nothing behind but a certificate is causing shipowners and shipyards to miss the moment to prepare, and that is a pity.

Meeting shipowners in person and working through issues with shipyards, I feel every day how much time and passion they pour into a single ship, and how seriously they take that responsibility. That is why we, as system integrators (SIs), should not treat this work as a mere business opportunity, but as a process of growing together with shipowners and shipyards. If we are going to do it, we should do it properly. They are counting on us

References

#ShipCyberSecurity#NuclearPropulsion#SMR#URE26#MaritimeCyber#IMO#MaritimeDecarbonization
Julius Shin
Julius Shin
Maritime Technical Consultant · Shipboard Cybersecurity & Compliance

Owner-side maritime cybersecurity advisor covering IACS UR E26/E27 compliance, zone and conduit design, and OT/IT security architecture for commercial vessels — working across LR, ClassNK, DNV, ABS, and BV newbuilding projects.